- Moving right along on galley progress! The main galley fiddles are installed and have received multiple coats of varnish.
- The new vent fan is installed and wired. Eric had to modify the previous vent air access and build a frame.
- The J-channels for the overhead panels are 80% installed. Lots of precise measuring involved for each one, plus plywood backing strips.
- Once the J-channels are completed, the next step will be the overhead panels. Along with panel installation, each light fixture will be taken down, cleaned of smoke damage and then re-wired and installed into the new overhead.
- We had a few warm days before the next cold snap set in, so Mary took advantage of the nice weather to catch up on outside maintenance. Along with other chores, the upper bridge deck was hand scrubbed to remove the accumulation of winter dirt, dust and pollen.
Maritime Humanitarian and Christian Missionary endeavors in the South Pacific.
Thursday, March 7, 2019
Progress Update: March 7th
Saturday, February 23, 2019
Progress Update: February 23rd
(Eric pre-fitting galley fiddles)
- Galley fiddle installation is underway! Each fiddle is set with teak deck caulking (very strong hold for the marble counters) and then clamped in place. It takes about 24 hours for a really good set.
- Ten vinyl soffit panels were purchased today and should be enough to complete the galley overhead. A new ceiling vent fan was purchased as well.
- Next up: Progress will continue on the fiddles and prep will begin for the overhead panels.
Sunday, February 10, 2019
Progress Update: February 10th
- Eric rewired and installed the galley light switch, added a new latch to the utility closet door and installed the refurbished A/C vent. We will be ordering new mesh for the back of the vent to replace the old mesh ruined by the smoke damage.
- The wood pile had a much needed re-stacking for better access to the wood needed for current projects.
- Galley fiddles have been cut, planed, routed and sanded. Next comes installation of the fiddles along the galley counters except in front of the sink.
- After completion of a current side job for our personal support, installation of the fiddles will begin.
Wednesday, January 30, 2019
Progress Update: January 30th
(Eric building A/C vent box)
- The galley now has A/C and heat! Eric installed a double junction funnel, built a vent box and added new ducting.
- Eric built framing and an access door for the utilities service area. It has now been caulked, sanded, primed and given two coats of paint.
- Next step is putting the filter vent access panel on the front of the door.
Sunday, January 20, 2019
2018 Annual Newsletter
Using
ships to reach the most remote people groups with love, mercy and
relief in the name of Jesus Christ
_______________________________________________________________
Dear
Friends,
All
of us at IMS want to take this opportunity to thank those of you who
have supported us with prayers, finances and parts over the last
year. We also want to provide you with an update on the substantial
progress made toward our mission of supporting Christian and
humanitarian missions in the South Pacific island area.
Efforts
in 2018 were focused in the two main areas of refit for deployment of
the m/v Far Horizons and engagement with key organizations operating in Vanuatu
to ensure alignment of our goals. For those of you who have not been
involved in a ship refit operation, it involves a lot of materials
and effort. IMS was blessed this year to have received everything we
needed in terms of financial, material and labor support.
Here
is a list of the many refit projects we were able to complete this
year, thanks to our supporters and volunteers:
•
Rebuild of helm guest
quarters to now sleep 3 people, including storage, heat/AC and shower
facilities
•
Rebuild of lower helm
station and hallway including flooring, storage, wood work, ceiling,
walls and lighting
•
Refurbishment of lower
guest quarters to now sleep 6 people, by building additional bunks
and shower facilities
•
Verified the operation of
the single-side band radio, VHF radio and long range radar units
•
Replaced curtains
throughout to improve privacy and keep the interior cooler
•
Rebuild of fuel injector
pump, filters and starting battery of starboard generator
•
Installation of new
intake fans for engine room
•
Refurbishment of aft
water tank for storage 750 gallons of fresh water
•
Brought wiring of galley
stove up to code
•
Replacement of main raw
water pump for heat/AC supply
•
Repaired steering system
hydraulic leaks
•
Moved Far
Horizons to new dockage for more
reliable power supply
Looking
forward to 2019 projects:
•Refurbish
galley cabinets, replace stove
•Rebuild
utility / laundry room
•Rebuild
stairwells
•Modernize
sewage treatment system
•Refurbish
hydraulic power pack and crane
•Rebuild
forward potable water tank
•Donation
of materials or parts are always welcome!
We
are very thankful to the Lord Jesus for His provision and blessing
this year.
We
humbly ask for your prayers and support to help us continue our
mission, and to follow our progress on our Blog.
Sincerely,
Eric and Mary
Lamoray,
President and
Sec/Treasurer of IMS, Inc.
Monday, January 14, 2019
Progress Update: January 14th
(Eric installing cleats)
- The galley storage/hutch area is almost completed!
- Still to come: Fiddles around the counter top and removable fiddles for the lockers where there will be a lot of motion in rough seas.
- The area surrounding the stove will be primed and painted with epoxy paint.