Saturday, March 6, 2021

Update: March 6th

 Note: Sorry for the lack of photos on this post. We are experiencing problems with uploads and internet connections. 

  • Eric built a radar reflector out of aluminum we had on hand.
  • We installed a new loud haler/horn signal unit.
  • We obtained and installed an Iridium Go satellite hub for weather and high seas communications. 
  • All our charts for the entire trip from our current location in Louisiana to the South Pacific destination are in.

Next up is to obtain cruising guides for areas we will be stopping in during our journey.

No comments:

Post a Comment