Monday, June 15, 2020

Prgress Update: June 15th

 (Eric caulking galley sink)
  • The side-decks repainting/non-skid  is complete! Next for painting the border and non-skid on the forward and aft cabin tops and caulking of the inner toe-rail.
  • Eric built the next set of bookshelves for the main salon. A few more to build and we should be finished with that particular project.
  • We caught up on lots of engine and generator maintenance.
  • The wooden tool drawers from Eric's old shipwrights chest have been modified to fit in a space on the boat. This mission vessel is going to offer lots of workshop ability when we are finished.
  • Other small projects completed this month were fixing the breather system on the main engine to reduce oil consumption, re-caulking a leaky sink rim and fixing a spot of plumbing in the forward head.
  • Next up will be two shelves built into a cabinet for more tool storage.