Monday, December 31, 2018

Progress Update: December 31st

 (Eric beginning galley rebuild)
  • Now that the overhead has been repaired, building the cabinets is next. 
  • There will be three sets of storage cabinets. One on the side of the stove and two at the back. An overhead access box will allow for fan exhaust, wiring and plumbing from the top deck.
  • At this stage, two of the cabinet sets are built, sanded, caulked and ready for primer. 
  • The stove outlet needed to be rewired and we had a local electrician do the job. 
  • We will be modifying the AC/Heat ducting to get some good air circulation in the galley.
  • We will also be relocating/rewiring the light switch for overhead galley lights.

























No comments:

Post a Comment