Friday, March 30, 2018

Progress Update: March 30th

 (Eric adjusting the cabin access hatch)

Almost finished with the guest cabin and head!
  • Aluminum trim has been installed around the access hatch in the head floor.
  • Mahogany trim was cut, fitted and installed in the head.
  • The shower port is caulked
  • The sink cabinet has been primed and painted
  • The carpet is installed in the cabin.











2 comments: