Progress Update: March 3rd


(Eric installing overhead panels)
  • The main guest cabin is close to completion. A new bench/storage area has been built, installed and painted. The overhead panels along with trim and seam covers were cut, fitted, painted and installed. 
  • The shower stall is next with plumbing currently underway. The wall was cut away around the faucets and holes drilled for PEX tubing.