Friday, March 23, 2018

Progress Update: March 23rd

(Eric installing vinyl flooring)
 
  • Hot and cold plumbing runs have been hooked up under the sink and in the shower.
  • All the FRP wall and overhead panels have been installed in the guest head and shower. 
  • Teak trim was used in the shower and mahogany trim is currently being installed in the head.
  • Waterproof vinyl flooring has been installed in the head. Carpeting will be used in the main cabin.