Friday, July 21, 2017

Progress Update: July 21st


(Eric preparing to run ducting)

So very grateful for the carpentry and painting help provided by a fellow missionary who stayed with us several days this past week. He worked alongside Eric and often by himself and we were able to make wonderful progress on several projects. 
A new floor has been built under the bunk in the captains cabin with four access sections. More ducting was run through a couple of very difficult spots and the last of the overhead in the forward guest cabin was built, installed and primed!
He wishes to remain anonymous so I have tried to hide his face in the photos while still desiring to give him credit.

 Installing cleats in preparation for the new flooring under the bunk.


Installing floor board access sections










 Finished and ready to paint


The beautiful new floor! 










 First of the ducting heading to the lower cabins.


DJ preparing to install more ducting.





 Eric wrestling ducting through some difficult spots






Overhead being built for the forward guest cabin.








 Overhead, ready to install.



Installing the overhead 










 Primer!