- The under-bunk, main salon storage box is completed! This will provide a safe place for clamps, the small drill press and belt sander. There is more room for other tools as well.
- The water maker is up and running after being pickled for over 6 months. We now have the ability to create 24 gallons of pure water in an hour. This was a very important project and we are very grateful for the relative ease in getting it running again. Eric went through the manual with a fine-tooth comb and carefully implemented each step with success.
- Eric has begun working on the deck nonskid in sections. Each section will be prepped with sanding and a bit of caulking repair if needed and then re-painted. The first coat of paint receives a thorough coat of non-skid sand and once the paint dries, the excess sand is swept up with the shop-vac. Then it receives two more coats of paint. Good non-skid is a safety issue on a boat and can save from dangerous slips and falls. It is especially needed underway to provide secure footing in rough weather.
Maritime Humanitarian and Christian Missionary endeavors in the South Pacific.
Friday, April 17, 2020
Progress Update: April 17th
(Eric beginning work on under-bunk box project)
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment