- The three 5x10 storage units have all been consolidated and organized into a 10x20. That was a big job and we are so glad it is finished. Now Eric has much better access to tools and supplies needed for projects.
- Leaks are being repaired as the weather permits and areas in the boat that are wet due to cold weather condensation are being addressed.Winter is difficult on a non-insulated boat but hopefully this will be the last winter for this vessel.
- We have talked again with the individual that rebuilds our particular anchor windlass. Instead of buying a new windlass, he will rebuild it for about half the cost of a new one. This will save the ministry several thousand dollars! Thank you Lord!!
- The new Groco head has arrived! A few installation parts need to be ordered and then Eric can replace the old head.
Maritime Humanitarian and Christian Missionary endeavors in the South Pacific.
Monday, November 11, 2019
Progress Update: November 11th
Progress moving slowly but always forward. As per usual, we begin a project only to be delayed by
the need to fix something first. In the long run we know it is better to
tackle a problem when it presents itself. Just frustrating to be in a
constant stop and start mode, but we will get through it.