Progress moving slowly but always forward. As per usual, we begin a project only to be delayed by the need to fix something first. In the long run we know it is better to tackle a problem when it presents itself. Just frustrating to be in a constant stop and start mode, but we will get through it.
  • The three 5x10 storage units have all been consolidated and organized into a 10x20. That was a big job and we are so glad it is finished. Now Eric has much better access to tools and supplies needed for projects.
  • Leaks are being repaired as the weather permits and areas in the boat that are wet due to cold weather condensation are being addressed.Winter is difficult on a non-insulated boat but hopefully this will be the last winter for this vessel.
  • We have talked again with the individual that rebuilds our particular anchor windlass. Instead of buying a new windlass, he will rebuild it for about half the cost of a new one. This will save the ministry several thousand dollars! Thank you Lord!!
  • The new Groco head has arrived! A few installation parts need to be ordered and then Eric can replace the old head. 