Saturday, May 18, 2019

Progress Update: May 18th


(Eric working in the day head)
  • Work in the day head is almost completed. The overhead is installed as well as the flooring. All that remains to finish the job is installation of wood trim for the flooring and an 18 inch  aluminum threshold. 
  • Wood trim for the galley flooring and cabinet have also been made and are ready for install.  






 