Sunday, March 31, 2019

Progress Update: March 31st


(Eric repairing one of the galley hatches)
  • The new galley flooring installation is completed! Next will be the aluminum hatch rims. There are five wire and hydraulic run access hatches to do.
  • two of the hatches needed repair. The damaged section was removed and a 'biscuit cutter tool' was used for slots and wood 'bicuits' inserted with glue to join the new section to the old hatch. 
  • The last overhead section in the galley is being worked on slowly in order to give Erics' neck and shoulders a break.
  • Eric also did a plumbing job repair to give us water and ice in the refrigerator again. Grateful for this wonderful blessing! 