Progress Update: July 29th


(Eric hand-planing VHF mount)

The bridge area progress is moving along very well.
  • Eric finished the bridge wire runs and some of the varnish. Also Eric made bezels and openings in the lower bridge overhead for mounting electronic units.
  • The new vinyl overhead in the bridge is up. It looks really good!
  • A couple side jobs were completed as well. A wheel on the ships boarding ladder was repaired. The salvaged Ham Radio was checked to insure it was operational and then cleaned of smoke damage.