Sunday, July 29, 2018

Progress Update: July 29th


(Eric hand-planing VHF mount)

The bridge area progress is moving along very well.
  • Eric finished the bridge wire runs and some of the varnish. Also Eric made bezels and openings in the lower bridge overhead for mounting electronic units.
  • The new vinyl overhead in the bridge is up. It looks really good!
  • A couple side jobs were completed as well. A wheel on the ships boarding ladder was repaired. The salvaged Ham Radio was checked to insure it was operational and then cleaned of smoke damage.









Tuesday, July 10, 2018

Progress Update: July 10th

(Eric varnishing bridge trim strips)
  • The bridge overhead, coverings and wire run boxes are almost complete. Each piece has to be custom cut, shaped, sanded, cherry stained, varnished (3 coats), re-fit, liquid nails adhesive applied to the backs and finally, nail gunned in place. A lot of steps but it is worth it!
  • After the last pieces are in place, seam caulking will be applied to give it a nice finished look. Electronics placement and installation will be next.