Tuesday, May 29, 2018

Progress Update: May 29th


 (Eric reinstalling water tank cover)
  • The water tank is finished! 750 gallons now available after a very difficult job. One more water tank to go but it can wait for a bit while we catch up on some other important projects. 
  • Eric repaired some leaks on the aft teak deck by scraping out the old seams, re-caulking, trimming and sanding. 
  • The first of the two forward A/C units has been mostly plumbed and wired.
  • A new pump and float switch has been wired in the forward lower sump.


 