(Eric reinstalling water tank cover)
- The water tank is finished! 750 gallons now available after a very difficult job. One more water tank to go but it can wait for a bit while we catch up on some other important projects.
- Eric repaired some leaks on the aft teak deck by scraping out the old seams, re-caulking, trimming and sanding.
- The first of the two forward A/C units has been mostly plumbed and wired.
- A new pump and float switch has been wired in the forward lower sump.
No comments:
Post a Comment