(Eric starting the top, single bunk) 

Moving right along!
  • The A/C ducting is completed, ready for hookup to units and wiring.
  • The top, single bunk frame is built and base will be added next.
  • There was a rather inaccessible storage locker that is now being made into a front opening cubby, located on the right-hand side of the bottom bunk headboard. Eric cut an access door, built a new bottom shelf, caulked several open seams and then covered the opening at the top of the locker. Next up for this locker will be primer and paint.