The permanent workshop ports are now completed and installed. The caulking has to set a couple days before it can be cleaned up on the other side of the glass. We will reach these areas using the skiff.
The guest head is next and work has begun on the overhead A/C ducting that will lead to the workshop. Plumbing access hatches have been cut into the floor boards in the hallway between the main staterooms. One of the side by side utility closets in the hallway has been partially painted and prepped for the new location for the water heater. A shelf will be added above it to hold the A/C unit.
DJ is currently running wiring needed for the new bilge pumps about to be installed under the hallway floor.
Last port!
Lots of sealant!
Tightening up
Cutting first access hatch
for plumbing upgrade.
First hatch cut and ready for cleats.
Second hatch cut and cleats
being installed.
The new water heater closet with Stix primer.
The vinyl tubing in the corner is going away and being
replaced with schedule 80 PVC.
DJ cut access holes in the corners and Mary applied a final coat of paint over the primer.
Work starting in the forward guest head.
Mary prep sanding electric head motors
and head seats.
Sanded and ready for spray painting
Head motors primed
and ready for paint.
Eric spray painting head motors, seats and covers.
DJ preparing to run new wiring
Bilge pumps and heavy-duty switches.
Eric will build bases for secure installation.
Mary hand-sanding plumbing parts
while Penny supervises!