(Eric doing sanding prep)
The forward cabin is painted! The drawers for the 2 dressers still need to be sanded and painted, the overhead customized and the floor carpeted.
The new mahogany hand rail and walnut floor trim have also been installed in the forward hallway.
Penny supervising!
Primer coat on the walls.
This bunk storage space needed some extra work. Eric shored up one of the inner floorboards and also filled several cracks and openings along the bottom back section with 2 applications of expanding foam. The foam was then trimmed flush and painted.
Getting started with primer inside one of the dressers. The bottom back had an opening that we filled with expanding foam.
Mary applying first coat of paint.
Penny supervising installation of floor trim. The mahogany hand rail looks really nice!
No comments:
Post a Comment