(Eric pre-fitting galley fiddles)
- Galley fiddle installation is underway! Each fiddle is set with teak deck caulking (very strong hold for the marble counters) and then clamped in place. It takes about 24 hours for a really good set.
- Ten vinyl soffit panels were purchased today and should be enough to complete the galley overhead. A new ceiling vent fan was purchased as well.
- Next up: Progress will continue on the fiddles and prep will begin for the overhead panels.
(Eric running fiddle stock through the planer)
- Eric rewired and installed the galley light switch, added a new latch to the utility closet door and installed the refurbished A/C vent. We will be ordering new mesh for the back of the vent to replace the old mesh ruined by the smoke damage.
- The wood pile had a much needed re-stacking for better access to the wood needed for current projects.
- Galley fiddles have been cut, planed, routed and sanded. Next comes installation of the fiddles along the galley counters except in front of the sink.
- After completion of a current side job for our personal support, installation of the fiddles will begin.